Raw Materials, Workforce, Space and Transport FAQ
Site, people and logistics

Raw Materials, Workforce, Space and Transport FAQ

The questions that come up after the equipment is chosen: how long installation takes, how many engineers are needed, how many staff the plant requires, and what space and equipment the site must provide.

  • Installation, assembly and training typically take 30–50 days
  • Staffing levels and the skills each role needs
  • Building height, floor area, loading equipment and container logistics

At a glance

Installation and training
About 30–50 days on site, depending on machine count
Site equipment needed
Crane or forklift, plus a loader for raw material feeding
Workforce
Fermentation 1, loader driver 1, control room 1, packaging 2 (small plant)
Building height
Set by the dryer and bucket elevators, typically 8–12 m clear for a full granule line

Installation, workforce and site questions

How many days do assembly, operation and training need?

About 30 to 50 days, depending on the number of machines and local conditions. Small powder lines at the lower end of that range can be assembled in about a week if the civil works are complete and a crane or forklift is available. Make sure the site is ready with the necessary installation tools — a crane or forklift is essential, and the plant must be able to receive containers and move them to the installation area.

How many engineers will be sent to assemble the machines and train our staff?

Normally one or two YUSHUNXIN engineers, depending on the size of the line and whether mechanical and electrical commissioning can run in parallel. For a powder line, one engineer is usually sufficient; for a complete granule line with automatic batching and PLC control, two engineers — one mechanical and one electrical — shorten the commissioning period considerably. Your team should include at least one electrician and two mechanical fitters to work alongside them.

What is the required building height and floor area?

Both depend on the production capacity and the machines selected — the dryer, the bucket elevators and the storage bins are what set the height requirement. As a guide, a powder line needs 5–7 m clear height, a granule line with a rotary dryer needs 8–12 m, and a line with bulk storage silos needs more. We provide a general arrangement drawing with the height requirements marked so your builder can confirm the site before manufacture begins.

How many workers are needed to operate the plant, and what skills should they have?

For a small plant the usual team is: one person responsible for fermentation, who should understand aerobic composting so they can control moisture and turning frequency; one loader driver to bring raw material to the line; one operator at the control panel, who should have a basic electrical or mechanical background; and two people on packaging, which requires no special skills. That is five people for a farm-scale line.

What other auxiliary tools or equipment will the plant need?

A loader or forklift for raw material feeding is essential and is the item most often overlooked in a first budget. Beyond that: a crane or telehandler for installation, a moisture meter, a temperature probe long enough to reach the core of your piles, a set of hand tools for routine maintenance, a pressure washer for cleaning separators and screens, and a small workshop area with a bench and storage for the wear parts you keep in stock.

How are the machines transported to our site?

Larger machines such as dryers, cooling drums, rotary screens and granulators are shipped whole or in two sections in standard 20-foot or 40-foot containers, and assembled on site. Small and medium machines ship fully assembled. Every shipment is accompanied by an equipment list for customs clearance, and the packing is designed for sea freight with the machines braced inside the container. We will confirm the container count and the maximum single-piece weight for your port before the order is finalised.

Inquiry

Tell us about your project

Send your raw material, target capacity and country. Our engineers reply within one working day with a process route, equipment list and budget.

We respect your privacy and will not share your information with other entities.

Ready to turn your waste into fertilizer?

Send us your raw material and target capacity — we will propose the process, the machines and the budget.

WhatsApp
Get a Quote WhatsApp